Recognition
Do you recognize yourself?
Your host has become slow, expensive, or unreachable, or all three.
You've wanted to leave for a long time, but the fear of breaking everything keeps you.
Your corporate emails live on the same account as the site.
Nobody knows exactly what is configured where.
What it costs your business
Remaining with a poor host because migration feels risky means paying every month for a known problem. An improvised migration can cost even more through downtime, lost email and silently broken forms. The difference is a methodical transition plan.
Delivery
THE GXN INTERVENTION
We inventory everything at your current host, copy and test on the new environment, and perform a controlled switch with an rollback plan ready. The goal: no one notices except for improvements, not even your clients or teams.
Decision benchmark
THE 7 STEPS TO SAFE MIGRATION
- 01Inventory : site, databases, emails, DNS, certificates, scheduled tasks, integrations. Everything that exists is listed, this is the step that failed migrations skipped.
- 02Copy : the complete environment is reproduced on the new hosting.
- 03Tests : the copied site is checked in depth: pages, forms, payments, integrations.
- 04DNS preparation : the settings that make the switch almost instantaneous.
- 05Toggle : in planned window, with rollback plan ready.
- 06Verification : everything is retested in production: forms, emails, certificates.
- 07Monitoring : the following days are closely monitored; the old environment is only closed after complete confirmation.
Decision benchmark
THE EMAIL TRAP
The classic migration disaster: corporate emails hosted on the same account as the site, forgotten in the plan. Result, days of lost, invisible, unrecoverable messages. Our inventory treats emails like a construction site in its own right: where it lives, where it will go, and how the transition is made without losing a single message.
Scope
WHAT’S INCLUDED
Complete inventory · reproduction and testing on the new environment · cutover plan with rollback · planned email migration · post-cutover verification · close monitoring · documentation of the new environment.
Process
HOW IT HAPPENS
Seeing the 7 steps above is literally our process. The initial assessment determines complexity and timing; the switch is made at the moment you choose.
Qualification
GOOD CANDIDATE / LESS GOOD CANDIDATE
For you if: you know you have to leave · the current environment is poorly documented (just our specialty) · corporate emails are in the portrait. Not for you if: the current hosting is healthy and the problem is elsewhere (we will tell you during the evaluation).
The scope and modalities are specified after the evaluation, before any commitment.
Frequently asked questions
FAQs
01Will there be an interruption?
The goal is zero perceptible interruptions. Modern DNS failover, well prepared, is done in minutes.
02What happens to our emails?
They are inventoried, migrated according to a dedicated plan, and verified. No message lost, it’s a commitment to method.
03Can we migrate a site we don't control yet?
That calls for a platform takeover, beginning with access recovery. See our Website takeover service; this is one of GXN’s core specialties.
04How long?
The inventory gives the schedule. Most enterprise migrations are completed in days, the switchover itself in minutes.
Tell us what you want to leave, and why. We will tell you what migration really involves.